Scrap steel and other building materials can be processed

 

 
Working Principle: Block stone will be evenly fed into Jaw crusher from silo by Vibrating feeder for primary crushing, then, the stone after primary crushing will be fed to the Impact crusher by Belt conveyor for further crushing; the stone after further crushing will be fed into Vibrating screen by belt conveyor for screening and getting stones with several different specifications, and then, the stones met size requirements will be sent to finished stockpile by belt conveyor; while those do not meet the size requirements will be fed into the impact crusher by belt conveyor for re-crushing, so the above steps form a closed multiple cycles. The product size can be combined and graded according to the needs of users and equipped with auxiliary dust removal equipment for protecting the environment.
With the rapid development of accelerated urbanization , the construction waste has become a trouble that can’t be ignored any more. As the main equipment handling the construction waste, the jaw crusher and Mobile crushing station made great contribution to the construction industry. Construction waste is entirely possible to be recycled by jaw crusher . Scrap steel and other abandoned buildings materials can be processed and directly reused . So the need for jaw crusher in the construction market has been increased in 2012. In 2013, Henan Hongxing Heavy Machinery will take more efforts to develop and research new type of jaw crusher to meet the requirement of different consumers.