Concrete batching plant consists of the main engine, weighting system, conveying system, storage system, control system and other ancillary facilities. With wide application of the concrete batching plant, we have a certain understanding to it. Today the technical personnel of Henan Daswell Machinery Co., Ltd, will mainly introduce how to solve the cylinder troubles of concrete batching plant.
First, the lack of cylinder output force, usually because of piston and piston rod stuck, poor lubrication, insufficient air supply, or condensed water and impurities in cylinder, you should readjust the center of the piston rod to ensure the alignment of the piston rod and cylinder.
Second, if the cylinder transmission power is not enough, you can check the sealing ring. If the ring is worn, you shoud change a new one.
Third, cylinder appears internal or external leakage, usually due to the eccentric piston rod installation, insufficient lubricating oil, sealing ring worn, etc.
Fourth, always check whether the lubricator is working well to ensure good lubrication of the components.
Fifth, when sealing ring is worn or damaged, it should be promptly changed; keep clear condensed water and impurities in the cylinder in time.